HSN code 9801: All items of machinery including prime movers, instruments, apparatus and appliances, control gear and transmission equipment, auxiliary equipment (including those required for research and development purposes, testing and quality control), as well as all components (whether finished or not) or raw materials for the manufacture of the aforesaid items and their components, required for the initial setting up of a unit, or the substantial expansion of an existing unit, of a specified : (1) industrial plant, (2) irrigation project, (3) power project, other than solar power plant or solar power project (4) mining project, (5) project for the exploration for oil or other minerals, and (6) such other projects, other than solar power plant or solar power project, as the central government may, having regard to the economic development of the country notify in the official gazette in this behalf, and spare parts, other raw materials (including semi-finished material) or consumable stores not exceeding 10% of the value of the goods specified above provided that such spare parts, raw materials or consumable stores are essential for the maintenance of the plant or project mentioned in (1) to (6) above

GST on HSN 9801 is 18%, from 22 September 2025 (Notification 9/2025-Central Tax (Rate), Schedule II, S. No. 635).

GST rate entries for heading 9801

GSTGoods the entry coversCodes in the entryWhere it is
18%All items of machinery including prime movers, instruments, apparatus and appliances, control gear and transmission equipment, auxiliary equipment (including those required for research and development purposes, testing and quality control), as well as all components (whether finished or not) or raw materials for the manufacture of the aforesaid items and their components, required for the initial setting up of a unit, or the substantial expansion of an existing unit, of a specified: (1) industrial plant, (2) irrigation project, (3) power project, (4) mining project, (5) project for the exploration for oil or other minerals, and (6) such other projects as the Central Government may, having regard to the economic development of the country notify in the Official Gazette in this behalf; and spare parts, other raw materials (including semi-finished materials of consumable stores) not exceeding 10% of the value of the goods specified above, provided that such spare parts, raw materials or consumable stores are essential for the maintenance of the plant or project mentioned in (1) to (6) above.9801Notification 9/2025-Central Tax (Rate), Schedule II, S. No. 635

Codes under heading 9801

HSN codeDescriptionGST rate
980100All items of machinery including prime movers, instruments, apparatus and appliances, control gear and transmission equipment, auxiliary equipment (including those required for research and development purposes, testing and quality control), as well as all components (whether finished or not) or raw materials for the manufacture of the aforesaid items and their components, required for the initial setting up of a unit, or the substantial expansion of an existing unit, of a specified : (1) industrial plant, (2 irrigation project, (3) power project, other than solar power plant or solar power project (4) mining project, (5) project for the exploration for oil or other minerals, and (6) such other projects, other than solar power plant or solar power project, as the central government may, having regard to the economic development of the country notify in the official gazette in this behalf, and spare parts, other raw materials (including semi- finished materials of consumable stores) not exceeding 10% of the value of the goods specified above, provided that such spare parts, raw materials or consumable stores are essential for the maintenance of the plant or project mentioned in (1) to (6) above :18%
98010011For industrial plant project18%
98010012For irrigation plant18%
98010013For power project, other than solar power plant or solar power project18%
98010014For mining project18%
98010015Project for exploration of oil or other minerals18%
98010019For other projects, other than solar power plant or solar power project18%
98010020Components (whether or not finished or not) or raw materials for the manufacture of aforesaid items required for the initial setting up of a unit or the substantial expansion of a unit18%
98010030Spare parts and other raw materials (including semi-finished materials or consumable stores for the maintenance of plant or project18%

Rates are the total GST (CGST plus SGST, or IGST) in force from 22 September 2025, from the Consolidated GST rate chart of goods w.e.f. 22.09.2025, as amended up to 31.03.2026, compiled by the West Bengal Commercial Taxes Directorate (GST PPU) from Notification No. 9/2025-Central Tax (Rate) and 10/2025-Central Tax (Rate), both dated 17.09.2025; schedule and serial numbers are as that chart lists them. Codes from the GSTN HSN/SAC master (tutorial.gst.gov.in, HSN_SAC.xlsx, updated 26 Nov 2026). Notifications after 31 March 2026 aren’t included, and earlier rates aren’t shown here. Check the notification before you rely on a rate for an invoice or a return.

Invoicing or filing with this code?

Your GST returns need the right HSN code and rate on every line. We register you for GST and file your returns at fixed fees, with GST shown before you pay.

GST return filingGST registrationSearch another code

Google reviews

4.9★★★★★

From 178 reviews on Google

Read all on GoogleWrite a review

  • GOVARDHANI M★★★★★ 4 years ago

    Thank you for your professional experience and quick service. Completed on time and made us to know what's going on in every step and updated everything very transparently. Will reach out to you for my future requirements. All the Best Indtaxes team.

  • Ruhi Mahajan★★★★★ 5 years ago

    Had a great experience with Mr. Sorabh. He was very quick and explained me very well the process and details. I was hesitant to first applying via online as these days the scams and all are so common. But after talking with Indtaxes persons, my doubts were cleared properly. Mr. Javed from their account team too helped alot and handled my request very efficiently. Within 15 minutes the process was complete. Thank you

  • Rahul KB★★★★★ 5 years ago

    I am totally satisfied with the services. They have good knowledge and experience. I will definitely recommend them.

  • Reviews from Google Maps, as Google shows them.